Showing posts with label engineering heritage. Show all posts
Showing posts with label engineering heritage. Show all posts

Sunday, 3 January 2016

Sydney Water Supply Upper Canal, NSW

Sydney Water Supply Upper Canal

Mount Annan/Currans Hill/Catherine Field/Leppington
Camden LGA, NSW

Upper Canal built in the 1880s  (WaterNSW)

History and Description

The Upper Canal is an engineering marvel and is entirely gravity fed. It is probably the most important engineering heritage item in the Camden LGA.

In 1867, the growth of Sydney coupled with recurring dry seasons, brought into sharp focus the pressing need for a water supply, which was larger and more reliable than the existing Botany Swamps source. This lead the Governor (Sir John Young) to appoint a special Commission to investigate how an adequate long term supply might be achieved. (SHI)

The Water Supply Canal consists of tunnels, open canals and aqueducts that convey water 62 km from Pheasants Nest to Prospect Reservoir, entirely by gravity. The canal passes under part of the Australian Botanic Garden at Mount Annan via a 686 metre tunnel.  (ABG, Mount Annan)

When the Upper Nepean Scheme was commissioned in 1888, it diverted water (which previously would have flowed down the lower stretches of the Nepean River to Camden and Penrith) into the Upper Canal, by means of which it was conveyed to Prospect Reservoir and thence to Sydney

The Upper Canal was built between 1880-88 after more than a decade of investigation into schemes to provide Sydney's fourth source of water supply.

The Camden Water Supply Works were completed and officially opened in November 1899, rating commencing from 1st January 1900.

This scheme, first proposed in 1869, harnessed the headwaters of the Nepean River and its tributaries, the Cataract, Cordeaux and Avon Rivers, to ensure a reliable, high-quality water supply for the rapidly growing city. (State Heritage Inventory)

The canal provides water for Camden, Campbelltown and Liverpool, also Wilton, Appin and Douglas Park. Until 1960 when the Warragamba Dam was completed, the Upper Nepean system supplied most of Sydney's water. It is a remarkable engineering feat which will continue to supply this most precious resource for many years to come.

The Sydney Water Supply Canal is managed by the Sydney Catchment Authority. It runs through the centre of the Australian Botanic Garden and supplies most of the irrigation water for the Garden.

The canal is mainly cut through natural sandstone bedrock but some sections, especially where it passes through shale, are lined with sandstone, brick or cement. It is believed that sandstone quarried from the north face of Mount Annan was used for this purpose and as capping on the brick aqueduct south of the tunnel. (Australian Botanic Gardens, Mount Annan)

The canal drops just 50 metres in elevation over 54 kilometres after the Nepean and Cataract tunnels - just 0.1 percent grade - a marvellous feat of engineering following the earth's contours.(WaterNSW)

Condition and Use

The canal is in good condition. (SHI)

Apart from the decommissioning of the Lower Canal, which nonetheless still remains a distinct entity, the whole of the Upper Nepean Scheme remains largely intact and performs the same functions as originally intended. (SHI)

Heritage Significance

An early water supply canal built 1880-1888 and still in use today. (SHI)

It has functioned as a unique part of the main water supply system for Sydney for over 120 years, and apart from development in supply and improvements has changed little in its basic principles since the day it was completed, except for the decommissioning of the Lower Canal in the 1990s (now owned by Department of Environment, Climate Change and Water).

It provides detailed and varied evidence of engineering construction techniques prior to the revolution inspired by reinforced concrete construction. Although concrete was later used to improve the durability of the System, much of the earlier technology is still evident along the Canal.

The scheme possesses many elements of infrastructure which are of world and national renown in technological and engineering terms. (SHI)

Heritage Listing

Camden LEP Item I122
State Heritage Inventory
State Heritage Register Listing No 4580004

Read More

State Heritage Inventory Click here
The Upper Canal - WaterNSW Click here
125 Years of the Upper Nepean Scheme Click here
The Upper Nepean Scheme on Wikipedia Click here
Engineers Australia and Prospect Reservoir Click here
Camden Heritage List Click here

Macarthur Bridge, Camden. NSW

Macarthur Bridge 

Nepean River Crossing,
Camden Bypass, Camden. NSW


Macarthur Bridge view from Nepean River floodplain c2015 (I Willis)


History and Description
The Macarthur Bridge is a 26-span, 3380 feet (approximately 1.12 km) long concrete structure that carries the Camden Bypass across the Nepean River and its flood plain. The bridge was built between 1971 and 1973, originally to carry Hume Highway traffic, on a flood-free alignment around Camden.

The bridge was an important piece of economic and social infrastructure for the local area. The new bridge allowed the diversion of coal trucks from the Burragorang Valley coalfields  away from Camden's main street from 1973. Coal trucks then travelled along Druitt Lane and over the Macarthur Bridge to the Glenlee Washery at Spring Farm. These events also co-incided with the 1973 Three Cities Plan for the region which planned for major urban growth for the area.

The bridge has become an important piece of engineering heritage in the local area.

In 2002 the NSW Minister for Transport replied to a question from Dr Elizabeth Kernohan, Member for Camden, about the bridge. The Minister stated
I am advised that Macarthur Bridge was built in the early 1970's on the basis that most of the long distance traffic would use the F5. I am advised that the primary function of the Macarthur Bridge was for use as a flood relief route. It was built parallel to the Cowpasture Bridge at Camden to take the full traffic load when the Cowpasture Bridge is impassable.
I am advised by the Roads and Traffic Authority (RTA) that the bridge referred to was not specifically designed to be widened at a later date. (NSW Parliament, 8 May 2002)
The Camden Bypass
The Camden Bypass is the former Hume Highway alignment between the localities of Cross Roads and Camden. It is marked as State Route 89. The proper route is from Cross Roads, skirting Camden via the Camden Bypass and ending at Remembrance Drive, another part of the former Hume Highway near Camden South.

The  Camden Bypass was in turn bypassed in December 1980 when the section of what was then called the South Western Freeway (route F5) from Campbelltown to Yerrinbool was opened. It has grown in importance as a major arterial road linking the Hume Motorway, WestLink M7 and M5 South Western Motorway interchange at Prestons, near Liverpool, with Camden.


Macarthur Bridge approaches from southern end at Camden South c.2006 (Ozroads.com.au)
Open to traffic and construction details  
The official plaque on the bridge states:
Macarthur Bridge.
The bridge was designed by the staff of the Department of Main Roads and is the longest structure built by the Department since its inception in 1925. Length (Overall) 3380 feet comprising 26 spans each of 130 feet long. Width between kerbs 30 feet with one footway 5 feet wide. Piled foundations (max 90 feet deep) were constructed by the Department's Bridge construction organisation. Piers and superstructure by contact by John Holland (Constructions) Pty Ltd. Total cost of bridge £2,600,000.
RJS Thomas Commissioner for Main Roads
AF Schmids Assistant Commissioner for Main Roads
GV Fawkner Engineer-in-Chief
FC Cook Engineer (Bridges)
Department of Main Roads, New South Wales
Open to traffic on 26 March 1973

Heritage Listing  
None at present

 Read More
State Route 89 on Ozroads Website Click here
State Route 12 on Paul Rands Website Click here